The following tutorial shows how you could set up your system step-by-step for multi-device folio production, using either pixel-perfect or actual size Artboards and properly configured templates.
Current version: 1.0, 29 June 2012.
Download link (PDF format, 5.3Mb)
Reference Materials
Enterprise Server 9 documentation
About Enterprise 9 and Adobe DPS
Changing the Free/Paid status in Enterprise Server 9 of an issue that only exists on Adobe DPS
Changing the Public/Private status in Enterprise Server 9 of an issue that only exists on Adobe DPS
Removing an issue from Adobe DPS that does not exist in Enterprise Server 9
Overruling the folio creation behavior of Smart Connection 9
Setting up layout templates for Adobe DPS in Enterprise 9
Configuring the Adobe Content Viewer Text View mode in Enterprise Server 9
Comment
Do you have corrections or additional information about this article? Leave a comment! Do you have a question about what is described in this article? Please contact Support.
0 comments
Please sign in to leave a comment.